Evap02   Project involved the Door to door movement of three evaporators ex Hamilton to Chinchilla Queensland.
     
Evap01    The Trans Tasman leg was via Roll on Roll off shipping.
     
Evaporator   With the Cunningham Highway being out of use due to the Queensland floods the Warrigal Highway had to be utilized. This alternative route had a height restriction of 5.4m and to keep within this allowance one end of the Evaporator was bookend ensuring the erection program schedule was maintained. Each Evaporator measured 31m x 5.5m x 5.0m and weighted 100 tonnes.

 

 